TPAC Reports

TPACTM Reports is part of the TPACTM suite of planning tools. It's a reporting package that is designed specifically to present complex crewing information to a transport enterprise.

How is TPAC Reports used?

TPACTM Reports is available in two modes: Server-side batch mode and on-demand via TPACTM Workbench.

Both modes offer the same library of reports and charts. In server-side batch mode operation, TPACTM Reports is configured to e-mail a group of subscribers a set of reports and charts that detail the quality of a run on completion. This allows all users to be informed as to the progress of a solution prior to publishing.

Alternatively, through TPACTM Workbench, a user can generate any report or chart from the TPACTM Reports library on demand. Reports can be rendered into a variety of formats including MS Word, MS Excel and Adobe's PDF.

TPACTM Report is fully extendible so if our library does not contain the report or chart you need, it is easy to add.

TPAC Reports Library

Manpower Planning Reports and Charts include:

  • Vehicle Fleet Charts
  • Current Crew Strength
  • Required Crew Strength
  • Comparison of Required vs. Current Crew Strength
  • Additional Crew Required
  • Annual Working Hours by Fleet
  • Anticipated Leave Entitlement Slots
  • Fleet Acquisition Plan
  • Fleet Type Utilization by month
  • Crew Monthly Planned Hours by rank
  • Standby Requirements
  • Known Unavailability - Sick Leave, Maternity Leave, Annual Leave Slots by fleet type and rank

Pairing Reports and Charts include:

  • Remaining Crew at Base
  • Plane Changes
  • Duty Time Distributions
  • Pairing Early Starts and Late Finishes
  • Rest Time Distributions
  • Duty Hours Distributions
  • Flying Hours Distributions
  • Overnight Distributions
  • Pairing Length Distributions

Roster Reports and Charts include:

  • Crew operating hours
  • Crew overtime hours (light/heavy)
  • Crew reserve/standby hours
  • Crew leave hours
  • Crew availability
  • Crew requirement
  • Crew paid time
  • Crew hours shortfalls
  • Crew reserve shortfalls
  • Fleet strength
  • Flying hours
  • Daily utilization

Performance

TPACTM Reports is suitable for large problems that are made up of thousands of staff and trips.

Architecture

TPACTM Reports is a Java based technology that is made available through the TPACTM Framework that includes:

  • TPACTM Optimizers:
  • TPACTM Workbench -- A Java-based graphical user interface designed to support analysis, editing and interaction with our optimizers on any desktop environment.
  • TPACTM Connect -- A web enabled remote access and systems integration platform.
  • TPACTM Rules -- A common rules repository designed to assure consistency of business rules across the enterprise.

Join 'Optimum' our Newsletter Service.